Norms / Functions (Manual - IV)

 

The norms set by Town & Country Planning Department for the discharge of its functions

(Reference: Section 4 (1) (b) (iv) of RTI Act, 2005)

Sl.No.Nature of ActivityNorms/Standards set/followed by the Department
1. Physical Survey  
For Built up areas 5.0 acres per Overseer-cum-surveyor per day
For semi-built up areas 10.0 acres per Overseer-cum-surveyor per day
For undeveloped /open areas 20.0 acres per Overseer-cum-surveyor per day
2. Preparation of Master Plan (upto Draft Master Plan level after the receipt of Base Map) Agency for preparation of Master Plan to be designated by the Development Authority / Special Area Development Authority / Controlling Authority for development area/ special development area/ regulated area, respectively.
New Master Plan Revised Master Plan
Master Plan for towns with <1.0 lac Population 4 months 6   months
Master Plan for towns with 1.0-5.0 lac Population 9 months 12 months
Master Plan for towns with 5.0-10.0 lac Population 12 months 15 months
Master Plan for towns with >10.0 lac Population 15 months 18 months
3. Preparation of Zonal Development Plans (upto draft level after the receipt of Base Map) Agency for preparation of Zonal Development Plan to be designated by the Development Authority/ Special Area Development Authority for development area/ special development Area respectively.
Zonal Development Plan up to 100 hect. area 6   months
Zonal Development Plan above 100 hect. area 12 months
4. Land Use Change (Technical opinion the Government /Development Authority/Controlling Authority) 30 Days
5. NOC on Building Plan & Layout Plans of Regulated Areas
'NO OBJECTION' certificate for building plans having total covered area more than 250 Sq.m and Lay-out plans of more than 1.0 hectare area by CTCP or his nominee
30 Days
6. All Government references viz. Parliament /Assembly Questions, Chief Minister's References, enquiries, technical advice, etc. 7-15 days after the receipt /as per the directions of the Government.
7. Preparation of policies related to Housing and Urban Planning Sector As per the directions of the Government.
8. Information to Public
under Right to Information Act,2005
As per the prescribed rules
9. Personal claims of employees such as House Building Advance, Leave Travel Concession Advance, cycle/motor cycle/car advance, Reimbursement of Medical claims, 30 days
10. Personal claims of employees such as GPF Advance/Withdrawals, Sanction of E. L./Casual Leave etc.  7-15 days